Category: Newsletter

  • The IRRAD Proton Facility Journey to get new detector systems ready for the Long Shutdown 3

    The IRRAD Proton Facility Journey to get new detector systems ready for the Long Shutdown 3

    The IRRAD Proton Facility Journey to get new detector systems ready for the Long Shutdown 3 The proton irradiation facility (IRRAD) at the PS East Area was built during the LS1 to cope with the increasing needs for radiation tests of the experimental community working for the HL upgrade of the LHC and beyond. The

    Explore →

  • CERN team maps the sPHENIX Solenoid at BNL

    CERN team maps the sPHENIX Solenoid at BNL

    CERN team maps the sPHENIX Solenoid at BNL In November 2022 the magnet service team of the Detector Technology group performed the mapping of the superconducting solenoid in the sPHENIX experiment at BNL (US). The two-week long campaign was the culmination of preparations that started during the most difficult times of the Covid pandemic. The

    Explore →

  • Chronicles of SND@LHC’s first year of data taking

    Chronicles of SND@LHC’s first year of data taking

    Chronicles of SND@LHC’s first year of data taking The year 2022 saw the culmination of 18 months of intense preparatory work with the SND@LHC Collaboration entering the highly anticipated phase of commissioning with beam and first year of data taking. After the installation of the neutron shield surrounding the target in March 2022, a small

    Explore →

  • Radioactive ion beams at ISOLDE bring the nuclear clock a tick closer

    Radioactive ion beams at ISOLDE bring the nuclear clock a tick closer

    Radioactive ion beams at ISOLDE bring the nuclear clock a tick closer The precise measurement of time and frequencies has always played an important role in the history of science. Since the adoption of the caesium-133 standard as the definition of the second within the Système International (SI) in 1967, a network of atomic clocks

    Explore →

  • HIKE collaboration targets a new era of kaon experiments

    HIKE collaboration targets a new era of kaon experiments

    HIKE collaboration targets a new era of kaon experiments The recently proposed High Intensity Kaon Experiments (HIKE) project offers a long-term vision for a research programme at CERN, covering experimental searches in the kaon sector that could enable a new generation of searches and indirectly probe new physics beyond the Standard Model. HIKE is intended

    Explore →

  • TOTEM collaboration prepares to explore new territories in forward physics

    TOTEM collaboration prepares to explore new territories in forward physics

    TOTEM collaboration prepares to explore new territories in forward physics A new period of data taking began at the world’s most powerful particle accelerator, the Large Hadron Collider (LHC), after more than three years of upgrade and maintenance work. This presents new opportunities for measurements to the LHC experiments including the smallest experiments at the

    Explore →

  • Testing silicon sensors for the CMS Endcap Calorimeter Upgrade

    Testing silicon sensors for the CMS Endcap Calorimeter Upgrade

    Testing silicon sensors for the CMS Endcap Calorimeter Upgrade Introduction The upcoming upgrade of the LHC to the HL-LHC will pose significant challenges to the detectors due to the enhanced radiation levels and the increase in the number of pile-up interactions. To meet the increased demands, CMS has undertaken an extensive R&D program to upgrade

    Explore →

  • ATLAS Tile Calorimeter Phase II Upgrade: entering production phase.

    ATLAS Tile Calorimeter Phase II Upgrade: entering production phase.

    ATLAS Tile Calorimeter Phase II Upgrade: entering production phase. The start of the High Luminosity LHC is approaching at a fast pace. In order to be ready with its upgraded front-end electronics and data acquisition systems, ATLAS Tile Calorimeter (TileCal) community is now entering the production phase, after a long R&D period and many design

    Explore →

  • MILLIQAN gets ready to have a look at the dark

    MILLIQAN gets ready to have a look at the dark

    MILLIQAN gets ready to have a look at the dark The milliQan collaboration is on track to finish the installation and commissioning of their Run 3 detector before the end of the YETS, Components of both the “bar” and “slab” detectors have been placed in a tunnel above the CMS experimental cavern over the last

    Explore →

  • ATLAS resumes operation after LS2 shutdown

    ATLAS resumes operation after LS2 shutdown

    ATLAS resumes operation after LS2 shutdown This year saw the long-anticipated start of the LHC Run 3, and the excitement was tangible in the ATLAS control room during the afternoon of the 5th of July when the LHC proton beams were expected to be brought into stable beam collisions, for the first time at the

    Explore →